Walsh Group
2022 - Ongoing
Aviation
Subsurface Imaging, Environmental Compliance, Quality Management, Materials Testing, QC/QA Inspection
The main tasks involved in the project are the extraction of current asphalt concrete coverings, carrying out essential excavation and leveling, compacting the soils again, enhancing storm drainage systems, setting up pavement marking, adding taxiway edge lighting and signs, runway guard lights, and conducting hydroseeding. Current runway project work that TQF is performing includes replacing the existing asphalt pavement on Taxiway L, the main taxiway that allows departing aircraft to connect from the terminal to the runway and other aircraft facilities.